| installation type | power at charging point | vehicle charger power | cable to be used | battery charge (recommended) | 45 kWh battery charging time |
| public fast charging point1 (DC) | ≥ 80 kW | 80 kW | tethered cable | 15-80% | 40 min |
| public charging point1 (AC) | 22 kW | 11 kW / 22 kW | mode 3 charging cable included with purchase | 15-80% | 1h34 |
| home charging point2 (AC) | 11 kW | 11 kW / 22 kW | mode 3 charging cable included with purchase | 15-80% | 2h32 |
| 7.4 kW | 11 kW / 22 kW | 15-80% | 4h11 | ||
| reinforced domestic socket (AC) | 3.7 kW | 11 kW / 22 kW | optional mode 2 standard or flexi-charger cable | 15-80% | 9h36 |
| standard domestic socket3 (AC) | 2.3 kW | 11 kW / 22 kW | optional mode 2 flexi-charger cable | 15-80% | 15h51 |